dc.descriptionThe present case study of feasibility for the improvement of a single-phase electric motor control panel, is made based on the compilation of the information that the interview carried out with the Manager gave us in order to be able to meet the needs of the Akí warehouse. We proceeded to implement a control system for the management of the water pumps to make their work more efficient. An improvement was implemented in the control panel by changing devices that serve as protection such as the thermal contactor that prevents the motor from overheating, the motor guard to avoid voltage variations, the circuit breaker will help us to disable the power in case it is energized. the cabinet or electrical panel where the devices are housed and the grounding. Glycerin manometers were also implemented in the water pipes, in order to measure the pressure, this together with the control panel activates the motors, m1, m2, m3, according to the demand and needs. Making the system more efficient and does not have to be operated manually. This project was carried out with the descriptive analytical method, with the interview technique that through it it was possible to know how the system operated, what were its deficiencies and how to implement improvements. After having obtained all the most relevant information, the objective for the improvement of the system and the simplified vision of its operation was determined.es_ES
dc.descriptionThe present case study of feasibility for the improvement of a single-phase electric motor control panel, is made based on the compilation of the information that the interview carried out with the Manager gave us in order to be able to meet the needs of the Akí warehouse. We proceeded to implement a control system for the management of the water pumps to make their work more efficient. An improvement was implemented in the control panel by changing devices that serve as protection such as the thermal contactor that prevents the motor from overheating, the motor guard to avoid voltage variations, the circuit breaker will help us to disable the power in case it is energized. the cabinet or electrical panel where the devices are housed and the grounding. Glycerin manometers were also implemented in the water pipes, in order to measure the pressure, this together with the control panel activates the motors, m1, m2, m3, according to the demand and needs. Making the system more efficient and does not have to be operated manually. This project was carried out with the descriptive analytical method, with the interview technique that through it it was possible to know how the system operated, what were its deficiencies and how to implement improvements. After having obtained all the most relevant information, the objective for the improvement of the system and the simplified vision of its operation was determined.es_ES
dc.description.abstractEl presente caso de estudio de factibilidad para el mejoramiento de un panel de control de motores eléctricos monofásicos, está realizado en base a la recopilación de la información que nos arrojó la entrevista realizada al Gerente con la finalidad de poder atender las necesidades del almacén Akí. Se procedió a implementar un sistema de control para el manejo de las bombas de agua para hacer más eficiente su trabajo. Se implementó un mejoramiento en el panel de control cambiando dispositivos que sirvan de protección como el contactor térmico que evita el sobrecalentamiento del motor, el guarda motor para evitar las variaciones de voltaje, el disyuntor nos ayudara a deshabilitar la energía en caso de que se energice el gabinete o el tablero eléctrico donde están alojados los dispositivos y la puesta a tierra. También se implementó manómetros de glicerina en las tuberías de agua, con la finalidad de medir la presión, esto en conjunto con el panel de control acciona los motores, m1, m2, m3, según la demanda y la necesite. Haciendo que el sistema sea más eficiente y no tenga que ser operado manualmente. Se realizó este proyecto con el método analítico descriptivo, con la técnica de la entrevista que por medio de ella se pudo saber cómo operaba el sistema, cuáles eran sus deficiencias y como implementar mejoras. Luego de haber obteniendo toda la información más relevante se determinó el objetivo para el mejoramiento del sistema y la visión simplificada de su funcionamiento.es_ES
dc.format.extent26 p.es_ES
dc.language.isoeses_ES
dc.publisherBABAHOYO: UTB, 2021es_ES
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectFactibilidades_ES
dc.subjectMejoramientoes_ES
dc.subjectPaneles_ES
dc.subjectControles_ES
dc.titleEstudio de factibilidad para el mejoramiento de un panel de control de motores eléctricos monofásicos (bombas de agua usadas contra incendio)es_ES
dc.typebachelorThesises_ES


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Atribución-NoComercial-SinDerivadas 3.0 Ecuador
Excepto si se señala otra cosa, la licencia del ítem se describe como Atribución-NoComercial-SinDerivadas 3.0 Ecuador