dc.descriptionThe Odorisio company is located in the Los Robles citadel of the City of Babahoyo, it is dedicated to the construction of streets, highways, sidewalks, bridges and other roads for vehicles or pedestrians, in this case study the problems that They appear in the company and it causes inconvenience when providing a service due to the machinery in poor condition and the short rental contract, the problems of property, money and equipment cause concern in the company and that damages the image and credibility of the same. In this case study, an interview was carried out with the Manager of the Company and a SWOT analysis was carried out to obtain information and to be able to identify both internal and external problems of the company. This case study is under the line of research Financial, Administrative, Tax, Audit and Control Management and with the subline Public and Private Companies and Institutions for the reason that the Odorisio dam is a private company, the method used is the evaluative one. of a qualitative nature and the deductive method by which an investigation analysis will be allowed. The results of the interview and the SWOT analysis that was carried out where the strategies were obtained have been obtained, in conclusion we observe that the problems that are found in the company is the lack of maintenance of the machinery is scarce and this causes the little contract of rent, workers are not trained and causes low performance and income and utility of the company without very low, inadequate acquisition of spare parts, warehouses are occupied by another company and causes problems and conflicts between workers.es_ES
dc.descriptionThe Odorisio company is located in the Los Robles citadel of the City of Babahoyo, it is dedicated to the construction of streets, highways, sidewalks, bridges and other roads for vehicles or pedestrians, in this case study the problems that They appear in the company and it causes inconvenience when providing a service due to the machinery in poor condition and the short rental contract, the problems of property, money and equipment cause concern in the company and that damages the image and credibility of the same. In this case study, an interview was carried out with the Manager of the Company and a SWOT analysis was carried out to obtain information and to be able to identify both internal and external problems of the company. This case study is under the line of research Financial, Administrative, Tax, Audit and Control Management and with the subline Public and Private Companies and Institutions for the reason that the Odorisio dam is a private company, the method used is the evaluative one. of a qualitative nature and the deductive method by which an investigation analysis will be allowed. The results of the interview and the SWOT analysis that was carried out where the strategies were obtained have been obtained, in conclusion we observe that the problems that are found in the company is the lack of maintenance of the machinery is scarce and this causes the little contract of rent, workers are not trained and causes low performance and income and utility of the company without very low, inadequate acquisition of spare parts, warehouses are occupied by another company and causes problems and conflicts between workers.es_ES
dc.description.abstractLa empresa Odorisio de encuentra ubicada en la ciudadela los Robles de la Cuidad de Babahoyo, se dedica a la construcción de calles, carreteras, veredas, puentes y otras vías para vehículos o peatones, en este estudio de caso se da a conocer los problemas que se presentan en la empresa y está causa inconvenientes al momento de brindar un servicio por las maquinarias en mal estado y el poco contrato de alquiler, el problemas de la propiedad, plata y equipo causa preocupación en la empresa y eso daña la imagen y credibilidad de la misma. En este estudio de caso se realizó un entrevista al Gerente de la Empresa y un análisis Foda para obtener información y poder identificar los problemas tanto interno como externo de la empresa. Este estudio de caso está bajo la línea de investigación Gestión Financiera, Administrativa, Tributaria, Auditoría y Control y con la sublinea Empresas e Instituciones Públicas y Privadas por el motivo que la presa Odorisio es una empresa privada, el método que se utilizó es el evaluativo de carácter cualitativo y el método deductivo por que se permitirá realizar un análisis investigación. Se ha obtenido resultados de la entrevista y del análisis Foda que se realizó en donde se la obtenido estrategias, en conclusión observamos que los problemas que se encuentran en la empresa es la falta de mantenimiento de las maquinarias es escaso y esto provoca el poco contrato de alquiler, los trabajadores no son capacitados y causa bajo rendimiento y los ingresos y la utilidad de la empresa sin muy bajos, la inadecuada adquisiciones repuestos, las bodegas son ocupadas por otra empresa y causa problemas y conflictos entre trabajadores.es_ES
dc.format.extent31 p.es_ES
dc.language.isoeses_ES
dc.publisherBabahoyo: UTB-FAFI. 2023es_ES
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Ecuador*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/*
dc.subjectMantenimientoes_ES
dc.subjectPropiedades_ES
dc.subjectAdministraciónes_ES
dc.titlePropiedad planta y equipo de la empresa Odorisio, periodo 2022.es_ES
dc.typebachelorThesises_ES


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Atribución-NoComercial-SinDerivadas 3.0 Ecuador
Excepto si se señala otra cosa, la licencia del ítem se describe como Atribución-NoComercial-SinDerivadas 3.0 Ecuador